Posts

Showing posts from February, 2011

Equitable Development

http://www.scribd.com/doc/48766947/The-Abbottabad-Resolution

Dome Home

The Super Insulated, Disaster-Proof, Low-Cost Home targeting 1 Billion Homeless all over the World has come near to on-ground realization. The 8 year and Rs. 3 million expenditure in seeking a solution has result in complete technical and planning verification. Teams from the Pakistan Army, Engineer Training Center, Risalpur and Design Cell of the Engineer-In-Chief Branch of GHQ have inspected the Low-Cost Frame Structure for Complete Shuttering for 20 Ft. dia. 12 ft. height with 2 extension at 6 ft. Kitchen and Toilet. Interconnected with main dome and each other through 2/3rds Verandah extending 6 ft. from main Dome. A total of  750 sq. ft.at estimated cost of Rs. 300,000.00. The cost of a complete set of Inner and Outer Shuttering of GI Pipe and MS Sheet is estimated at Rs. 1 million for mass replication. Cost of Vehicles, Equipment and Machinery for rapid construction is estimated at Rs. 5 million. Low-Cost single Inner Bamboo/ Wooden Shuttering is Rs. 40,000.00 and Low-Cost Tempor